June-July Summary 2020

Posted on May 25, 2020 in Building Project, 2020 Updates

Previous Update

Woodland Camp Archives

Next Update

Woodland Camp Update
June-July 2020  

 

Praise the Lord for His continued blessing and protection during this unprecedented world situation that we are going through. The construction at Woodland Camp had been slowed down, and the phase-completion dates adjusted. However, with the restrictions easing and the way of working within the COVID-19 regulations becoming more clear, the work is again picking up pace in the crucial summer months whilst being careful to keep the COVID-19 government regulations and the Health and Safety Executive guidelines. This includes the development of work team bubbles and track & trace procedures amongst other things. The crew size has reached around 20 regularly labouring saints, and we hope to be able to have a usable facility of 17 cabins, the completion of the refurbishment of the existing hall, and a good level of landscaping and paths completed before the end of October.

Prayer is still needed not only for this phase but also for the further development of this facility. We are currently awaiting for the council’s approval for the next phase (which includes the meeting halls) and a decision is due any day.

We feel this facility is crucial for the shepherding and perfecting of the saints and for the many new ones being opened by the world situation and contacted by the saints since the end of March. Please continue to pray that the facilities would be prepared in a timely way for the Lord’s seekers in Europe.

(Scroll through the slideshow below to see the progress from June to July 2020.)

After the installation of the trusses and finishing most of the work inside of the cabins, the focus has been on installing the following on the F cabins and B cabins: framing for the gables, noggins, the first layer of plywood on the roof, insulation, OSB (oriented strand board), the second layer of plywood on the roof and membrane, and waterproof materials for the flat roof. Additionally, floor insulation with heating pipes, screeding, metal roofing, and cladding were being installed. Outside of the cabins, we also began to grade the soil on the east side of the camp, outlined the footpaths, layed electrical cable for the footpath lights, capped the gas valves, and reviewed the landscaping work. Finally, brothers have been working on the refurbishment of the existing pavilion.

1 / 37
Trusses on the new B cabin
2 / 37
Noggins (blocking) between the trusses to give rigidity to the roof
3 / 37
Framing the roof gables
4 / 37
Waterproofing the flat roof
5 / 37
After installing all the noggins (blocking), the first layer of plywood is laid.
6 / 37
Breathable membrane with battens for the second layer of ply
7 / 37
Second layer of ply on the roof
8 / 37
Insulation inside the cabin roof
9 / 37
OSB installation after the insulation on the roof
10 / 37
Framing the gables in the F cabins
11 / 37
Services of hot water, gas, fresh water, and drainage on the F cabin
12 / 37
Insulation around the cabins
13 / 37
Floor insulation on the cabins and the preparation of the deck ceiling
14 / 37
Laying heating pipes
15 / 37
Floor screed
16 / 37
Framing the decking for the B cabin
17 / 37
Flashing for the window frames
18 / 37
Breathable membrane and battens in preparation for the cladding around the cabins
19 / 37
Metal roofing on the F cabins
20 / 37
Metal framing for the walls inside the cabins
21 / 37
Framing the deck in the front and back on the F cabin
22 / 37
Decking in front of the F cabin
23 / 37
Cladding on the B cabin
24 / 37
Bunk beds were built inside one of the cabins on the east side as the sample room.
25 / 37
Doors in the central plant
26 / 37
Backfilling the kerbs
27 / 37
Access gate between Woodland Camp and Priors
28 / 37
Brothers coordinating the paths and landscaping
29 / 37
Levelling of the soil on the east side
30 / 37
Trenching for the electrical cables for the lights on the paths
31 / 37
Kerbs underneath that will help the gravel and help with the drainage system
32 / 37
Trenching and kerbs for electrical, data cables, and drainage
33 / 37
Kerbs for the parking lot
34 / 37
The brothers are doing refurbishment work in the main hall, changing ceiling boards, and creating access to the external bathrooms from the inside of the hall.
35 / 37
36 / 37
37 / 37
#shadow-root(closed)
#shadow-root(closed)


HOW TO DONATE



Resources
Newsletter
Free Study Bible
Daily Radio Broadcast
Updates & News
Reports
Building Project
Woodland Camp
Donations
Contact Us

Amana Trust
Bower House
Orange Tree Hill
Romford, RM4 1PB

110 Pentonville Road
Islington
London, N1 9JB


+44 (0) 1708 380 301
[email protected]

All verses and footnotes taken from the Holy Bible Recovery Version. Anaheim: Living Stream Ministry, 2003.


Copyright © 2018-. All Rights Reserved. Amana Trust, Bower House, Orange Tree Hill, Romford, Essex, RM4 1PB. Email: [email protected]. Registered in England and Wales, company number: 4366897. A charitable company limited by guarantee, charity number: 1093401. VAT: GB711295848 | Privacy Policy

Powered by Configio a Momentive Software owned company