April 2021

Posted on April 27, 2021 in Building Project, 2021 Updates

Previous Update

Woodland Camp Archives

Next Update

Woodland Camp Update
April 2021

 

Through the remainder of 2020 and the beginning of 2021, we have been dealing with the limitations of the current pandemic. These have included not being able to obtain certain materials and supplies and also needing to take extra care to protect the health of the workers on site. Despite these restrictions, the work has continued to progress, and the Lord has covered all the workers and visitors on the site.

In the following photos, you will see that all the work on the cabins on the east side of the camp has almost been completed, including the standard two-bedroom cabins and the larger family cabins. A significant start on an enlarged cabin (called a D cabin) was made, and when finished, it will provide an indoor recreational area and a temporary location for meetings of up to approximately 150 people. We have also begun to work on the landscape around Woodland Camp. The focus for this is the grass and shrubs in the immediate vicinity of the cabins, but we have also created a path down the hill to a viewing deck overlooking the ponds. Finally, the main driveway has been improved greatly with installation of kerbs and a finished road surface.

(Scroll through the slideshow below to see the progress)

1 / 19
Newly-completed cabins with paths under construction
2 / 19
Laying of lawn in the area in front of the east cabins
3 / 19
Newly-constructed cabins with lawn and paths complete
4 / 19
The front of the family cabins with three bedrooms and open plan lounge, kitchen, and dining area
5 / 19
The back of the family cabins
6 / 19
Grading of the soil for the foundation of the D cabin
7 / 19
Installation of D cabin services including sewage, cold and hot water, data, and gas
8 / 19
Layer of stone carefully levelled with a grading laser.
9 / 19
Waterproof membrane and insulation layer
10 / 19
Installation of a mesh of reinforced steel (rebar)
11 / 19
Completed reinforced rebar mesh
12 / 19
18 concrete trucks bring 130 cubic meters of concrete, which are poured in stages via a 36m boom during one long but great day under the Lord’s blessing and protection
13 / 19
Using a float machine to level the concrete
14 / 19
Completed reinforced steel and concrete D cabin foundation.
15 / 19
Viewing deck overlooking the ponds
16 / 19
The original main driveway with work beginning to dig out and level the surface
17 / 19
Laying of a compacted-stone base.
18 / 19
Installation of kerbs
19 / 19
The final road after asphalt applied
#shadow-root(closed)
#shadow-root(closed)


HOW TO DONATE



Resources
Newsletter
Free Study Bible
Daily Radio Broadcast
Updates & News
Reports
Building Project
Woodland Camp
Donations
Contact Us

Amana Trust
Bower House
Orange Tree Hill
Romford, RM4 1PB

110 Pentonville Road
Islington
London, N1 9JB


+44 (0) 1708 380 301
[email protected]

All verses and footnotes taken from the Holy Bible Recovery Version. Anaheim: Living Stream Ministry, 2003.


Copyright © 2018-. All Rights Reserved. Amana Trust, Bower House, Orange Tree Hill, Romford, Essex, RM4 1PB. Email: [email protected]. Registered in England and Wales, company number: 4366897. A charitable company limited by guarantee, charity number: 1093401. VAT: GB711295848 | Privacy Policy

Powered by Configio a Momentive Software owned company